Fly to Poland
Airline news, last minutes offers - fly to Poland

PICTURE: Boeing makes room for assembly of fourth 787 flight test aircraft

Boeing yesterday shuffled the line-up of the 787s on the final assembly line in Everett, Washington, to make room for a flight test airplane arriving later this month.

The 787 designated for fatigue testing was moved out of the final assembly factory to another production bay, which was not disclosed. The fatigue test airplane is not yet complete and assembly work will continue in the new location.

The move allows the second flight test aircraft to advance one position on the four-stage assembly line. Meanwhile, the third flight test aircraft will remain in the first position until assembly is ready to start on the fourth flight test. <P class=MsoNormal style=”

This entry was posted on Saturday, June 21st, 2008 at 2:00 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

No comments yet

Leave a comment

You must be logged in to post a comment.