Fly to Poland
Airline news, last minutes offers - fly to Poland

PICTURE: Boeing begins final assembly of second 787

Boeing has started final assembly of the second of six flight test aircraft for the 787 programme, passing a critical milestone after months of production delays.

The arrival of the second 787’s subassemblies from six major suppliers also marked another critical step, with each of the sections in much healthier shape than previous shipments.

“The degree of completeness of sections at the partners is significantly better than Airplane One,” says Steve Westby, vice-president of 787 final assembly and change incorporation. “Condition of assembly is much better and we will see continued improvements on the condition of each assembly shipped.” <P class=MsoNormal style=”mso-margin-top-alt: a

This entry was posted on Friday, February 15th, 2008 at 10:25 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

No comments yet

Leave a comment

You must be logged in to post a comment.