FlightBlogger: 787-10 headed for firm configuration milestone in 2009
Boeing VP and general manager Pat Shanahan says work on the 787-10 variant is continuing and a design freeze may occur in about 12 months.
This entry was posted on Monday, May 19th, 2008 at 10:58 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.