American completes first 767 revenue flight with blended winglets
American Airlines today completed the first flight of a Boeing 767-300ER with blended winglets supplied by Aviation Partners Boeing.
Flight 78 left Dallas/Fort Worth International Airport on 8 March at 8:35 p.m. with 204 passengers onboard, landing ahead of schedule on 9 March at London Heathrow.
American is the launch customer for the 11ft tall blended winglets on the 767-300ER, and APB partner GKN during the 2008 Farnborough air show said it plans to build 450 winglet shipsets for the 767-300ER, forecasting a build rate of 16 per month during peak production.
American says APB estimates each winglet-equipped aircraft should save up to 500,000 gallons of fuel annually depending on miles flown, which could result in a total savings of 29 million gallons annually.
<IMG style=”WIDTH: 445px; HEIGHT: 250px” alt=”" src=”../assets/getAsset.aspx?ItemID=27897″ borde
This entry was posted on Monday, March 9th, 2009 at 4:50 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.